Areas of Expertise
  • Extra-Low-Voltage Systems Design
    • Access Control and Management System (ACS)
    • Security and Intrusion Alarm System (SOTS)
    • Video Surveillance System (SVN)
    • CCTV System (SOT)
    • Intrusion Alarm System (SOS)
    • Intercom (DF)
    • Perimeter security alarm (TSOP)
  • BIM development
    • BIM Model Development
    • BIM design
  • Power supply systems design
    • Cable and Overhead Power Lines, 0.4-10 kV
    • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
    • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
    • Electricity metering system
    • Power equipment design
    • Lighting design
    • Lightning protection and grounding design
  • Communication Network Design
    • Fiber-Optic Communication Lines (FOCL)
    • Structured Cabling Systems (SCS)
    • Local area network (LAN)
    • Public Address and Radio Broadcasting Systems (RRL)
    • Wireless communication networks
    • Telephone and Internet
    • Cellular base stations
    • Power Line Carrier (PLC) Communications
  • Fire Protection Systems Design
    • Fire Alarm System (SPS)
    • Voice Alarm and Fire Evacuation Control System (SOUE)
    • Fire Protection System Automation (FPSA)
    • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
  • Integrated security systems design
    • Technical Security Systems Design (TSOB)
    • Design of Engineering and Technical Security Systems (ITSS)
    • Anti-Terrorism Security
  • Water supply and sewerage
    • External water supply networks
    • Internal water supply systems
    • Drainage systems
    • High-pressure pipeline systems
    • Pumping stations
    • Internal fire water supply
  • Heating, ventilation and air conditioning
    • Smoke removal system
    • Ventilation system
    • Air conditioning system
    • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
  • Architectural Design
    • Architectural design
    • Architectural and construction solutions
  • Structural Design
    • Reinforced concrete structures
    • Precast Reinforced Concrete Products
    • Steel Structures
    • Detailed Steelwork Drawings
    • Timber Structures
  • Engineering Systems Automation and Supervisory Control Design
About Us
  • Employees
Licenses
Contacts
Calculator
Projects
en
ru
en
Novosibirsk, st. Bolshevistskaya, 35, office. 316
+7 (383) 375-74-77 / +7 (923) 235-74-77
Mon-Fri: 09:00-18:00
en
ru
en
  • Special Offers
  • Payment and warranties
  • Vacancies
  • ...
    AYU
    engineering systems design company
    Areas of Expertise
    • Extra-Low-Voltage Systems Design
      • Access Control and Management System (ACS)
      • Security and Intrusion Alarm System (SOTS)
      • Video Surveillance System (SVN)
      • CCTV System (SOT)
      • Intrusion Alarm System (SOS)
      • Intercom (DF)
      • Perimeter security alarm (TSOP)
    • BIM development
      • BIM Model Development
      • BIM design
    • Power supply systems design
      • Cable and Overhead Power Lines, 0.4-10 kV
      • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
      • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
      • Electricity metering system
      • Power equipment design
      • Lighting design
      • Lightning protection and grounding design
    • Communication Network Design
      • Fiber-Optic Communication Lines (FOCL)
      • Structured Cabling Systems (SCS)
      • Local area network (LAN)
      • Public Address and Radio Broadcasting Systems (RRL)
      • Wireless communication networks
      • Telephone and Internet
      • Cellular base stations
      • Power Line Carrier (PLC) Communications
    • Fire Protection Systems Design
      • Fire Alarm System (SPS)
      • Voice Alarm and Fire Evacuation Control System (SOUE)
      • Fire Protection System Automation (FPSA)
      • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
    • Integrated security systems design
      • Technical Security Systems Design (TSOB)
      • Design of Engineering and Technical Security Systems (ITSS)
      • Anti-Terrorism Security
    • Water supply and sewerage
      • External water supply networks
      • Internal water supply systems
      • Drainage systems
      • High-pressure pipeline systems
      • Pumping stations
      • Internal fire water supply
    • Heating, ventilation and air conditioning
      • Smoke removal system
      • Ventilation system
      • Air conditioning system
      • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
    • Architectural Design
      • Architectural design
      • Architectural and construction solutions
    • Structural Design
      • Reinforced concrete structures
      • Precast Reinforced Concrete Products
      • Steel Structures
      • Detailed Steelwork Drawings
      • Timber Structures
    • Engineering Systems Automation and Supervisory Control Design
    About Us
    • Employees
    Licenses
    Contacts
    Calculator
    Projects
      AYU
      +7 (383) 375-74-77 / +7 (923) 235-74-77
      Areas of Expertise
      • Extra-Low-Voltage Systems Design
        • Access Control and Management System (ACS)
        • Security and Intrusion Alarm System (SOTS)
        • Video Surveillance System (SVN)
        • CCTV System (SOT)
        • Intrusion Alarm System (SOS)
        • Intercom (DF)
        • Perimeter security alarm (TSOP)
      • BIM development
        • BIM Model Development
        • BIM design
      • Power supply systems design
        • Cable and Overhead Power Lines, 0.4-10 kV
        • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
        • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
        • Electricity metering system
        • Power equipment design
        • Lighting design
        • Lightning protection and grounding design
      • Communication Network Design
        • Fiber-Optic Communication Lines (FOCL)
        • Structured Cabling Systems (SCS)
        • Local area network (LAN)
        • Public Address and Radio Broadcasting Systems (RRL)
        • Wireless communication networks
        • Telephone and Internet
        • Cellular base stations
        • Power Line Carrier (PLC) Communications
      • Fire Protection Systems Design
        • Fire Alarm System (SPS)
        • Voice Alarm and Fire Evacuation Control System (SOUE)
        • Fire Protection System Automation (FPSA)
        • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
      • Integrated security systems design
        • Technical Security Systems Design (TSOB)
        • Design of Engineering and Technical Security Systems (ITSS)
        • Anti-Terrorism Security
      • Water supply and sewerage
        • External water supply networks
        • Internal water supply systems
        • Drainage systems
        • High-pressure pipeline systems
        • Pumping stations
        • Internal fire water supply
      • Heating, ventilation and air conditioning
        • Smoke removal system
        • Ventilation system
        • Air conditioning system
        • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
      • Architectural Design
        • Architectural design
        • Architectural and construction solutions
      • Structural Design
        • Reinforced concrete structures
        • Precast Reinforced Concrete Products
        • Steel Structures
        • Detailed Steelwork Drawings
        • Timber Structures
      • Engineering Systems Automation and Supervisory Control Design
      About Us
      • Employees
      Licenses
      Contacts
      Calculator
      Projects
        en
        ru
        AYU
        EN EN
        Telephones
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        Email
        info@ayu.group
        The address
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Working hours
        Mon-Fri: 09:00-18:00
        AYU
        • Areas of Expertise
          • Areas of Expertise
          • Extra-Low-Voltage Systems Design
            • Extra-Low-Voltage Systems Design
            • Access Control and Management System (ACS)
            • Security and Intrusion Alarm System (SOTS)
            • Video Surveillance System (SVN)
            • CCTV System (SOT)
            • Intrusion Alarm System (SOS)
            • Intercom (DF)
            • Perimeter security alarm (TSOP)
          • BIM development
            • BIM development
            • BIM Model Development
            • BIM design
          • Power supply systems design
            • Power supply systems design
            • Cable and Overhead Power Lines, 0.4-10 kV
            • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
            • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
            • Electricity metering system
            • Power equipment design
            • Lighting design
            • Lightning protection and grounding design
          • Communication Network Design
            • Communication Network Design
            • Fiber-Optic Communication Lines (FOCL)
            • Structured Cabling Systems (SCS)
            • Local area network (LAN)
            • Public Address and Radio Broadcasting Systems (RRL)
            • Wireless communication networks
            • Telephone and Internet
            • Cellular base stations
            • Power Line Carrier (PLC) Communications
          • Fire Protection Systems Design
            • Fire Protection Systems Design
            • Fire Alarm System (SPS)
            • Voice Alarm and Fire Evacuation Control System (SOUE)
            • Fire Protection System Automation (FPSA)
            • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
          • Integrated security systems design
            • Integrated security systems design
            • Technical Security Systems Design (TSOB)
            • Design of Engineering and Technical Security Systems (ITSS)
            • Anti-Terrorism Security
          • Water supply and sewerage
            • Water supply and sewerage
            • External water supply networks
            • Internal water supply systems
            • Drainage systems
            • High-pressure pipeline systems
            • Pumping stations
            • Internal fire water supply
          • Heating, ventilation and air conditioning
            • Heating, ventilation and air conditioning
            • Smoke removal system
            • Ventilation system
            • Air conditioning system
            • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
          • Architectural Design
            • Architectural Design
            • Architectural design
            • Architectural and construction solutions
          • Structural Design
            • Structural Design
            • Reinforced concrete structures
            • Precast Reinforced Concrete Products
            • Steel Structures
            • Detailed Steelwork Drawings
            • Timber Structures
          • Engineering Systems Automation and Supervisory Control Design
        • About Us
          • About Us
          • Employees
        • Special Offers
        • Payment and warranties
        • Vacancies
        • For partners
        • Licenses
        • Calculator
        • Projects
        • Contacts
        • en
          • Language
          • en
          • ru
        • +7 (383) 375-74-77
          • Telephones
          • +7 (383) 375-74-77
          • +7 (923) 235-74-77
        • Novosibirsk, st. Bolshevistskaya, 35, office. 316
        • info@ayu.group
        • Mon-Fri: 09:00-18:00
        Home
        -
        Structural Design
        -Reinforced concrete structures
        Reinforced concrete structures

        Reinforced concrete structures

        Compliance We ensure that design documentation complies with current building codes and expert-review requirements.
        Optimization of solutions We design concrete and reinforced concrete structures with optimization of materials and cost.
        Exact calculation We perform accurate reinforced-concrete structural calculations for safe and reliable operation.
        Design documentation: from 14 days
        Working documentation: from 14 days
        Price from 50000 roubles
        Start a Project

        We design and perform calculations of reinforced concrete structures of buildings and structures, ensuring the strength, rigidity and durability of the structural design, taking into account loads, operating conditions and regulatory requirements.

        We carry out the design of reinforced concrete structures of buildings, including the calculation of slabs, beams, columns, foundations and load-bearing walls. We develop the design and calculation of reinforced concrete structures taking into account architectural solutions, engineering loads and construction technology. Well-designed reinforced concrete structures form a reliable frame of the building, ensuring its stability, safety and long service life.

         

        What does a construction company risk if there are errors in the calculation of reinforced concrete structures?

        The reinforced concrete frame is the backbone of any building. An error in the calculation of load-bearing structures does not immediately appear in estimates - it is revealed in cracks, deformations and expert comments that stop the entire construction. AYU-Project develops the KZh section as part of the design and working documentation, from the initial structural concept through resolution of the final expert-review comment. We design and perform calculations of reinforced concrete structures of buildings and structures, ensuring the strength, rigidity and durability of the structural design, taking into account loads, operating conditions and regulatory requirements.

        What is the KZh section, and why does your construction company need it?

        The KZh section (reinforced concrete structures) is a mandatory part of the design documentation, which records all calculation and design solutions for the load-bearing and enclosing reinforced concrete elements of the building. Its composition and content requirements are determined by Government Decree of the Russian Federation No. 87 dated 16.02.2008 No. 87 (as amended on 21.10.2025) “On the composition of sections of design documentation and requirements for their content”: this is an explanatory note, calculation justifications, structural drawings, reinforcement diagrams and material specifications. Without a well-designed QOL section, the design documentation will not pass the state expert review, a construction permit will not be issued - and the entire investment cycle of the facility will be paused.

        What are the dangers of errors in the calculation of reinforced concrete structures?

        Errors in the design of reinforced concrete structures are not just comments from experts; it is a chain of consequences, each of which is more expensive than the previous one. Incorrectly defined loads, underestimated reinforcement or an incorrect scheme for transferring forces to the foundation entail reworking not only the KZh section itself, but also adjacent sections - architectural solutions, foundations, roofing. Errors identified during construction or operation lead to costly reinforcement of structures, delays in project delivery, and legal risks for the designer and contractor. That is why, for the construction business, choosing a subcontractor for the development of the QOL section is a matter of risk management, and not just selecting a contractor.

        Composition of section RC: what we design

        The full development cycle of the QOL section in the AYU-Project covers all key reinforced concrete elements of the structural design of a building or structure:

        • Monolithic floor and coating slabs - calculation for the first (strength) and second (stiffness, crack resistance) groups of limit states in accordance with SP 63.13330.2018;
        • Crossbars, beams, purlins - determination of cross sections, selection of working and structural reinforcement taking into account real loads and spans;
        • Columns and racks - calculation for eccentric compression, checking stability under design and special combinations of loads;
        • Load-bearing walls and stiffening diaphragms - design of vertical and horizontal load-bearing elements to ensure spatial rigidity of the frame;
        • Foundations - monolithic slab, strip and pile-grillage; the type and parameters are selected based on the results of engineering and geological surveys;
        • Prefabricated and prefabricated monolithic structures - detailing of joints, statements and specifications of prefabricated elements in accordance with SP 311.1325800.2017 and SP 337.1325800.2017;
        • Calculation justifications - drawn up in a separate volume with models, calculation schemes and results of numerical analysis for submission for examination.

        At stage WD, detailed reinforcement diagrams for each element, joints and details, layout diagrams of embedded parts, and reinforcement and concrete consumption sheets are produced.

        How the design of RC occurs: stages of work

        Work on the QOL section is built in a clear sequence - each stage is based on the results of the previous one and undergoes internal testing before being transferred to the client.

        Stage 1 - Collection and analysis of initial data. We study the technical specifications, architectural solutions, geotechnical survey data, regulatory loads and the requirements of the technological specifications.

        Stage 2 - Development of a structural scheme. We determine the type of structural system (monolithic frame, prefabricated, prefabricated-monolithic, frameless), load transfer scheme and placement of load-bearing elements.

        Stage 3 - Calculation justification. We carry out spatial calculations of the structural diagram in a certified software package, select cross-sections of elements and reinforcement schemes.

        Stage 4 - Development of design documentation and working documentation. We produce a complete set of RC stage DD (for examination) and WD (for work): drawings, reinforcement diagrams, specifications, components and parts.

        Stage 5 - Expert-review support. We provide written responses to experts’ comments, make adjustments to the documentation and achieve a positive expert review opinion - without additional payment under the current contract.

        What standards are used to design reinforced concrete structures?

        Working according to outdated or irrelevant standards is one of the most common reasons for expert comments under section RC. AYU-Project carries out design strictly in accordance with the current editions of mandatory and recommended regulatory documents:

        • SP 63.13330.2018 “Concrete and reinforced concrete structures. Basic provisions" - a basic set of rules covering the calculation and design of monolithic and prefabricated reinforced concrete structures;
        • SP 311.1325800.2017 - for structures made of high-strength concrete of classes B60 and higher;
        • SP 337.1325800.2017 - for prefabricated monolithic structures;
        • SP 356.1325800.2017 - for frame reinforced concrete structural systems;
        • GOST 27751 - methodology for assessing the reliability of building structures;
        • Government Decree of the Russian Federation No. 87 dated 16.02.2008 No. 87 (as amended on 21.10.2025) “On the composition of sections of project documentation and requirements for their content” - regarding the structure and design of DD.

        Monitoring current revisions of regulatory documents is part of the internal quality system AYU-Project, and not a one-time task before the delivery of each project.

        Why do construction companies choose AYU-Project to design the RC section?

        Choosing a subcontractor to develop RC for a construction business is, first of all, a matter of reliability: reliability of calculations, deadlines and the final result. AYU-Project provides exactly this:

        • Accurate calculation of structures - we use certified calculation systems and multi-level internal testing, which eliminates errors in reinforcement and selection of sections;
        • Optimization of materials and cost - design solutions are developed taking into account the actual consumption of concrete and reinforcement, which reduces direct construction costs without compromising on reliability;
        • Guaranteed passing of the examination - project documentation is drawn up strictly in accordance with regulatory requirements, and comments are eliminated free of charge within the framework of the contract;
        • Fixed deadlines - deadlines are fixed by contract and controlled by the internal project management system; 17+ years on the market means 17 years without failure to meet agreed deadlines;
        • External design department format - we work as a subcontractor, integrate into your processes and regulations, adapt documentation formats to your customer’s requirements;
        • Confirmed qualifications - membership in SRO, specialists in the NOPRIZ registry, completed projects for Russian Railways, PJSC Rosseti Siberia, FGC, NTEK and other large customers.

        How much does it cost and in what time frame is the RC section developed?

        The cost of designing reinforced concrete structures is determined individually for each object and depends on its purpose, area, number of storeys, structural design and required documentation. For administrative and industrial buildings of average complexity, the estimated development time for the RC section of the DD stage ranges from 2 to 12 weeks; stage WD - from 2 to 10 weeks. An accurate calculation of cost and timing is provided according to the technical specifications or the available set of initial data. Send us a request: the project manager will contact you within one business day and prepare a commercial proposal.


        How the design of RC occurs: stages of work

        1. Submit an enquiry - the initial consultation is free
          Fill out the form on the website or call: +7 (383) 375-73-77 / +7 (923) 743-73-77. Indicate the type and purpose of the object, area and number of floors, required stages: DD, WD or full cycle.
        2. Receive a Commercial Proposal Within 1 Business Day
          The AYU-Project specialist will prepare CP with the price, timing and scope of work for section RC. When ordering RC and other structural or engineering sections at the same time, a discount is provided.
        3. Agree on the terms of reference and sign the contract
          We clarify the composition of the documentation being developed, the requirements for the structural system, and the file transfer format. The contract fixes the scope of work, cost and terms with financial responsibility for their compliance.
        4. Collection and analysis of initial data
          We study the technical specifications, architectural solutions, materials IGI, regulatory loads and requirements of the technological specifications. We determine the design parameters of the construction area: snow and wind areas, seismicity, design temperature.
        5. Development of a design diagram and calculation justification
          We determine the type of structural system and load transfer scheme. We perform spatial calculations in LIRA-SAPR or SCAD, select cross-sections of elements and reinforcement schemes. The results are presented in the form of a calculation and explanatory note.
        6. DD Stage Development and Expert Review Support
          We produce a complete set of RC stage DD: drawings, calculations, specifications. We accompany DD through the examination, provide answers to comments and make adjustments at no additional charge.
        7. Preparation and Delivery of Working Documentation (WD)
          After a positive expert review opinion from the examination, we develop working documentation for the quality of life: detailed reinforcement diagrams for each element, joints, embedded parts, reinforcement and concrete consumption sheets. We transmit in PDF and DWG formats, and, if necessary, in paper form.
        Read more
        Engineering Design Calculator

        Estimate Your Project Budget

        Enter the project parameters and scope of work to receive a preliminary cost range in a few steps.

        Calculate Project Cost
        Cost estimate

        Get a tailored project cost estimate.

        Leave your phone number and briefly describe the project. You can attach the Terms of Reference.

        * Fields marked with an asterisk are required
        Another file
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        Change picture

        Our Advantages

        Consistently High Quality When developing design documentation, we are guided by the provisions of GOST, building codes (SN) and building codes and regulations (SNiP), departmental building codes (BCN), state and industry standards.
        Impeccable business reputation Our projects, among other things, were developed for the needs of Russian Railways, PJSC Rosseti Siberia, Federal Grid Company, NTEC, Permtransgaz, Ministry of Digital and Technological Development of the Sakhalin Region, State Public Institution KK Digital Kuban, Ministry of Digital Development of the Krasnoyarsk Territory, Ministry of Education and Youth Policy of the Sverdlovsk Region.
        Great experience Extensive experience gained from many years of practice and cooperation with various enterprises and companies in Russia.

        How We Work

        01
        Step
        We review the facility
        Our engineers review the available documents, assess the facility and prepare the scope for commercial evaluation.
        02
        Step
        We prepare a commercial proposal
        Based on the agreed scope and fixed internal rates, we calculate the required work and prepare a transparent proposal.
        03
        Step
        We sign the agreement
        Our contracts define responsibilities, deadlines, deliverables and approval procedures clearly, balancing client interests and project requirements.
        04
        Step
        We deliver the documentation
        A responsible project lead coordinates the work with the client and keeps the documentation process under control through to delivery.

        Frequently Asked Questions

        • Reinforced concrete structures
        Is it necessary to coordinate the reinforced-concrete structures section with other sections of the project?

        Yes, and this is critically important. The reinforced-concrete structures section is developed in coordination with the architectural section (AR), as well as sections of engineering systems - HVAC, VK, electrical supply - to correctly account for holes, openings, embedded parts and equipment loads. AYU-Project carries out complex design, so inter-divisional coordination is organized within a single team without loss of time.

        Do you guarantee successful state expert review of the reinforced-concrete structures section?

        Yes. Project documentation is developed in strict accordance with the requirements of Government Decree of the Russian Federation No. 87 (as amended on 21.10.2025) and current codes and standards. If we receive comments from state or independent expert review bodies, we will eliminate them free of charge within the framework of the current contract.

        How long does it take to develop reinforced-concrete structures for MKD?

        The reinforced-concrete structures section of the design documentation stage for a typical MKD - from 2 to 12 weeks depending on the complexity. Detailed documentation of reinforced-concrete structures - from 2 weeks. Exact deadlines are fixed in the terms of reference and agreement with financial responsibility for their compliance.

        Do you work with the reconstruction and strengthening of existing reinforced concrete structures?

        Yes. We carry out calculation justification for strengthening structures during reconstruction, adding floors and changing the functional purpose of premises. If necessary, we will organize a technical inspection of the building before the start of design.

        Is it possible to order only the calculation part without drawings?

        Yes. We carry out calculation substantiation for checking existing structures, expert support or designer’s supervision - without developing a full set of drawings. The results of the calculations are presented in the form of a settlement and explanatory note.

        Do I need SRO approval to develop the reinforced-concrete structures section?

        Yes, the development of constructive sections of design documentation requires membership of the design organization in the SRO for design. AYU-Project is a member of the SRO and bears professional responsibility for the quality and regulatory compliance of the documentation produced. The company's specialists are registered in the NOPRIZ register.

        What standards are used to calculate reinforced concrete structures?

        The main standard is SP 63.13330.2018 “Concrete and reinforced concrete structures”. Additionally, we use SP 20.13330.2022 (loads and impacts), SP 22.13330.2016 (foundations of buildings and structures), SP 311.1325800.2017 (high-strength concrete), SP 337.1325800.2017 (prefabricated monolithic structures) and other sets of rules depending on the type of structure and facility.

        What is included in the KZh section of the design documentation?

        The reinforced-concrete structures section of the DD stage includes an explanatory note with justification for design solutions, the results of calculations of load-bearing elements, layout diagrams of structures, drawings of main components and specifications of reinforcement and concrete. At the WD stage, working drawings of each load-bearing element with reinforcement details, a steel consumption sheet and specifications of embedded parts are added.

        Licences and Certificates

        Notice of tax registration of individual entrepreneur Anastasia Sergeevna Ayupova
        Certificate of Anastasia Sergeevna Ayupova authorising the design of fire-safety systems for buildings and structures in operation
        NOPRIZ Certificate
        OPORA RUSSIA Certificate
        Explore This Section

        Related services

        Services that complement the project.

        01 BIM design 02 BIM development 03 Architectural and construction solutions 04 Architectural design 05 Cellular base stations 06 BIM Model Development
        About Us
        Employees
        Licenses
        Contacts
        Payment and warranties
        Special Offers
        Vacancies
        Become a Partner
        +7 (383) 375-74-77
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        info@ayu.group
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Consent to personal data processing
        Privacy Policy · Cookie Policy
        Site map
        en
        ru
        en
        { "@context": "https://schema.org", "@type": "Service", "name": "Reinforced concrete structures", "description": "We design and perform calculations of reinforced concrete structures of buildings and structures, ensuring the strength, rigidity and durability of the structural design, taking into account loads, operating conditions and regulatory requirements. We carry out the design of reinforced concrete structures of buildings, including the calculation of slabs, beams, columns, foundations and load-bearing walls. We develop the design and calculation of r", "provider": { "@type": "Organization", "name": "AYU-Project", "url": "https://www.ayu.group/" }, "areaServed": "Russia", "url": "https://www.ayu.group/en/konstruktivnye-resheniya/konstruktsii-zhelezobetonnye/" }