Cookies and analytics

Essential cookies are used to operate the website and its forms. Analytics will be enabled only after your consent. Read the Cookie Policy.

Font size
Background and font color
Images
Text scoring
Regular version of the site
AYU
engineering systems design company
+7 (383) 375-74-77
+7 (383) 375-74-77
+7 (923) 235-74-77
Email
info@ayu.group
The address
Novosibirsk, st. Bolshevistskaya, 35, office. 316
Working hours
Mon-Fri: 09:00-18:00
Areas of Expertise
  • Extra-Low-Voltage Systems Design
    • Access Control and Management System (ACS)
    • Security and Intrusion Alarm System (SOTS)
    • Video Surveillance System (SVN)
    • CCTV System (SOT)
    • Intrusion Alarm System (SOS)
    • Intercom (DF)
    • Perimeter security alarm (TSOP)
  • BIM development
    • BIM Model Development
    • BIM design
  • Power supply systems design
    • Cable and Overhead Power Lines, 0.4-10 kV
    • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
    • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
    • Electricity metering system
    • Power equipment design
    • Lighting design
    • Lightning protection and grounding design
  • Communication Network Design
    • Fiber-Optic Communication Lines (FOCL)
    • Structured Cabling Systems (SCS)
    • Local area network (LAN)
    • Public Address and Radio Broadcasting Systems (RRL)
    • Wireless communication networks
    • Telephone and Internet
    • Cellular base stations
    • Power Line Carrier (PLC) Communications
  • Fire Protection Systems Design
    • Fire Alarm System (SPS)
    • Voice Alarm and Fire Evacuation Control System (SOUE)
    • Fire Protection System Automation (FPSA)
    • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
  • Integrated security systems design
    • Technical Security Systems Design (TSOB)
    • Design of Engineering and Technical Security Systems (ITSS)
    • Anti-Terrorism Security
  • Water supply and sewerage
    • External water supply networks
    • Internal water supply systems
    • Drainage systems
    • High-pressure pipeline systems
    • Pumping stations
    • Internal fire water supply
  • Heating, ventilation and air conditioning
    • Smoke removal system
    • Ventilation system
    • Air conditioning system
    • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
  • Architectural Design
    • Architectural design
    • Architectural and construction solutions
  • Structural Design
    • Reinforced concrete structures
    • Precast Reinforced Concrete Products
    • Steel Structures
    • Detailed Steelwork Drawings
    • Timber Structures
  • Engineering Systems Automation and Supervisory Control Design
About Us
  • Employees
Licenses
Contacts
Calculator
Projects
en
ru
en
Novosibirsk, st. Bolshevistskaya, 35, office. 316
+7 (383) 375-74-77 / +7 (923) 235-74-77
Mon-Fri: 09:00-18:00
en
ru
en
  • Special Offers
  • Payment and warranties
  • Vacancies
  • ...
    AYU
    engineering systems design company
    Areas of Expertise
    • Extra-Low-Voltage Systems Design
      • Access Control and Management System (ACS)
      • Security and Intrusion Alarm System (SOTS)
      • Video Surveillance System (SVN)
      • CCTV System (SOT)
      • Intrusion Alarm System (SOS)
      • Intercom (DF)
      • Perimeter security alarm (TSOP)
    • BIM development
      • BIM Model Development
      • BIM design
    • Power supply systems design
      • Cable and Overhead Power Lines, 0.4-10 kV
      • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
      • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
      • Electricity metering system
      • Power equipment design
      • Lighting design
      • Lightning protection and grounding design
    • Communication Network Design
      • Fiber-Optic Communication Lines (FOCL)
      • Structured Cabling Systems (SCS)
      • Local area network (LAN)
      • Public Address and Radio Broadcasting Systems (RRL)
      • Wireless communication networks
      • Telephone and Internet
      • Cellular base stations
      • Power Line Carrier (PLC) Communications
    • Fire Protection Systems Design
      • Fire Alarm System (SPS)
      • Voice Alarm and Fire Evacuation Control System (SOUE)
      • Fire Protection System Automation (FPSA)
      • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
    • Integrated security systems design
      • Technical Security Systems Design (TSOB)
      • Design of Engineering and Technical Security Systems (ITSS)
      • Anti-Terrorism Security
    • Water supply and sewerage
      • External water supply networks
      • Internal water supply systems
      • Drainage systems
      • High-pressure pipeline systems
      • Pumping stations
      • Internal fire water supply
    • Heating, ventilation and air conditioning
      • Smoke removal system
      • Ventilation system
      • Air conditioning system
      • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
    • Architectural Design
      • Architectural design
      • Architectural and construction solutions
    • Structural Design
      • Reinforced concrete structures
      • Precast Reinforced Concrete Products
      • Steel Structures
      • Detailed Steelwork Drawings
      • Timber Structures
    • Engineering Systems Automation and Supervisory Control Design
    About Us
    • Employees
    Licenses
    Contacts
    Calculator
    Projects
      AYU
      +7 (383) 375-74-77 / +7 (923) 235-74-77
      Areas of Expertise
      • Extra-Low-Voltage Systems Design
        • Access Control and Management System (ACS)
        • Security and Intrusion Alarm System (SOTS)
        • Video Surveillance System (SVN)
        • CCTV System (SOT)
        • Intrusion Alarm System (SOS)
        • Intercom (DF)
        • Perimeter security alarm (TSOP)
      • BIM development
        • BIM Model Development
        • BIM design
      • Power supply systems design
        • Cable and Overhead Power Lines, 0.4-10 kV
        • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
        • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
        • Electricity metering system
        • Power equipment design
        • Lighting design
        • Lightning protection and grounding design
      • Communication Network Design
        • Fiber-Optic Communication Lines (FOCL)
        • Structured Cabling Systems (SCS)
        • Local area network (LAN)
        • Public Address and Radio Broadcasting Systems (RRL)
        • Wireless communication networks
        • Telephone and Internet
        • Cellular base stations
        • Power Line Carrier (PLC) Communications
      • Fire Protection Systems Design
        • Fire Alarm System (SPS)
        • Voice Alarm and Fire Evacuation Control System (SOUE)
        • Fire Protection System Automation (FPSA)
        • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
      • Integrated security systems design
        • Technical Security Systems Design (TSOB)
        • Design of Engineering and Technical Security Systems (ITSS)
        • Anti-Terrorism Security
      • Water supply and sewerage
        • External water supply networks
        • Internal water supply systems
        • Drainage systems
        • High-pressure pipeline systems
        • Pumping stations
        • Internal fire water supply
      • Heating, ventilation and air conditioning
        • Smoke removal system
        • Ventilation system
        • Air conditioning system
        • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
      • Architectural Design
        • Architectural design
        • Architectural and construction solutions
      • Structural Design
        • Reinforced concrete structures
        • Precast Reinforced Concrete Products
        • Steel Structures
        • Detailed Steelwork Drawings
        • Timber Structures
      • Engineering Systems Automation and Supervisory Control Design
      About Us
      • Employees
      Licenses
      Contacts
      Calculator
      Projects
        en
        ru
        AYU
        EN EN
        Telephones
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        Email
        info@ayu.group
        The address
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Working hours
        Mon-Fri: 09:00-18:00
        AYU
        • Areas of Expertise
          • Areas of Expertise
          • Extra-Low-Voltage Systems Design
            • Extra-Low-Voltage Systems Design
            • Access Control and Management System (ACS)
            • Security and Intrusion Alarm System (SOTS)
            • Video Surveillance System (SVN)
            • CCTV System (SOT)
            • Intrusion Alarm System (SOS)
            • Intercom (DF)
            • Perimeter security alarm (TSOP)
          • BIM development
            • BIM development
            • BIM Model Development
            • BIM design
          • Power supply systems design
            • Power supply systems design
            • Cable and Overhead Power Lines, 0.4-10 kV
            • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
            • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
            • Electricity metering system
            • Power equipment design
            • Lighting design
            • Lightning protection and grounding design
          • Communication Network Design
            • Communication Network Design
            • Fiber-Optic Communication Lines (FOCL)
            • Structured Cabling Systems (SCS)
            • Local area network (LAN)
            • Public Address and Radio Broadcasting Systems (RRL)
            • Wireless communication networks
            • Telephone and Internet
            • Cellular base stations
            • Power Line Carrier (PLC) Communications
          • Fire Protection Systems Design
            • Fire Protection Systems Design
            • Fire Alarm System (SPS)
            • Voice Alarm and Fire Evacuation Control System (SOUE)
            • Fire Protection System Automation (FPSA)
            • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
          • Integrated security systems design
            • Integrated security systems design
            • Technical Security Systems Design (TSOB)
            • Design of Engineering and Technical Security Systems (ITSS)
            • Anti-Terrorism Security
          • Water supply and sewerage
            • Water supply and sewerage
            • External water supply networks
            • Internal water supply systems
            • Drainage systems
            • High-pressure pipeline systems
            • Pumping stations
            • Internal fire water supply
          • Heating, ventilation and air conditioning
            • Heating, ventilation and air conditioning
            • Smoke removal system
            • Ventilation system
            • Air conditioning system
            • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
          • Architectural Design
            • Architectural Design
            • Architectural design
            • Architectural and construction solutions
          • Structural Design
            • Structural Design
            • Reinforced concrete structures
            • Precast Reinforced Concrete Products
            • Steel Structures
            • Detailed Steelwork Drawings
            • Timber Structures
          • Engineering Systems Automation and Supervisory Control Design
        • About Us
          • About Us
          • Employees
        • Special Offers
        • Payment and warranties
        • Vacancies
        • For partners
        • Licenses
        • Calculator
        • Projects
        • Contacts
        • en
          • Language
          • en
          • ru
        • +7 (383) 375-74-77
          • Telephones
          • +7 (383) 375-74-77
          • +7 (923) 235-74-77
        • Novosibirsk, st. Bolshevistskaya, 35, office. 316
        • info@ayu.group
        • Mon-Fri: 09:00-18:00
        Home
        -
        Heating, ventilation and air conditioning
        -Air conditioning system
        Air conditioning system

        Air conditioning system

        Guarantee of stability We ensure stable equipment operation and straightforward system maintenance.
        Deep integration We integrate air conditioning into the overall ventilation and heating system for maximum efficiency.
        Facility-Specific Design We develop solutions taking into account the area of the premises, the flow of people and the heat load.
        Design documentation: from 14 days
        Working documentation: from 22 days
        Price from 50000 roubles
        Start a Project

        Incorrectly calculated heat load is the main reason why air conditioners in a newly built building cannot cope with cooling on a hot day or “drive” extra kilowatts in winter: an error of 15-20% when selecting equipment is already established at the design stage. AYU-Project designs air conditioning systems (ACS) for facilities of any function and scale: we calculate the heat load taking into account the area of ​​the premises, heat gain from people, equipment and solar radiation, select the optimal scheme - split, VRF/VRV, chiller-fan coil or central air conditioner - and integrate it into the overall HVAC system of the building for maximum energy efficiency. SRO approval, normative control SP 60.13330.2020 with Amendments No. 1-5, fixed contract price and free edits based on the expert’s comments.

        What is included in the design of air conditioning systems?

        Design AC system is being developed as part of the subsection IOS 5.4 “Heating, ventilation and air conditioning, heating networks” according to Decree of the Government of the Russian Federation No. 87 dated 16.02.2008 (rev. 2023). The two stages - DD for examination and WD for installation and commissioning - differ in the degree of detail and the composition of documents.

        Design documentation stage includes:

        • An explanatory note justifying the chosen air conditioning scheme, describing the technical solutions adopted and the parameters of the design microclimate for GOST 30494-2011 And SanPiN 1.2.3685-21
        • Calculation of the heat load on the air conditioning system: heat gain through the building envelope, from solar radiation, from people, lighting and equipment according to the methodology SP 60.13330.2020 Appendix A
        • Justification for choosing the AC system type (split, multi-split, VRF/VRV, chiller-fan coil, central air conditioner) with a technical and economic comparison of options
        • Schematic diagrams of refrigeration supply: refrigerant or coolant lines, layout of outdoor and indoor units (for VRF) or chiller, fan coils and pump group
        • Refrigeration supply diagram with hydraulic parameters (for chiller-fan coil systems)
        • Tasks for related sections: KR (loads from outdoor units, chillers), EL (power, reliability category), AS/AD (control algorithms, integration into BMS)
        • Energy efficiency section: justification of seasonal EER and SCOP coefficients, comparison with the base case

        The WD Stage Includes:

        • Working drawings of refrigerant or coolant pipeline routes on plans M 1:50, axonometric diagrams
        • Equipment specifications: external and internal VRF/multi-split units with selection according to the thermal load of each room, chillers, fan coil units, pump groups, expansion tanks, heat exchangers
        • Installation diagrams: nodes for passage of pipelines through structures, fastening of external units with vibration insulation, drainage systems
        • Automatic control schemes for SCR: algorithms for operation in cooling, heating and ventilation modes, signal tables for BMS or centralized control
        • Bills of quantities, summary statements of equipment and pipelines
        • Programs and methods of commissioning work (PW) for air conditioning systems

        Comparison of stages design documentation and working documentation for air conditioning systems

        Parameter Design documentation stage Working Documentation Stage (WD)
        Goal Justification of decisions, passing of examination Work execution, installation, commissioning
        Load calculation Total heat load by building and zones Refined calculation for each room for the selection of blocks
        Schemes Principled, without bindings Working drawings M 1:50, axonometry
        Equipment System type, power class Specific models, part numbers, specifications
        Automation Principal algorithms, task on AD Complete control diagrams, BMS signal tables
        Related Sections Tasks in KR, EL, AS Mounting units with EO, integration with BMS and APS
        Result Positive Expert Review Opinion As-built documentation for commissioning the facility

        What air conditioning systems are used depending on the type of object?

        The choice of SCR scheme is a key design decision that affects capital costs, operating costs and ease of management over the entire life of the building. AYU-Project selects the type of system based on the results of calculating the heat load, analyzing architectural solutions and requirements for microclimate control in each zone.

        • Split systems and multi-split systems - used for individual rooms or small objects with an area of up to 300-500 m²; easy to install, do not require a machine room; do not provide fresh air and require a separate ventilation system
        • Multizone VRF/VRV systems - the most common solution for office, hotel and retail buildings with an area of ​​500-5 000 m²; one external branch serves up to 64 internal units of various types (wall-mounted, cassette, duct, floor-mounted); length of refrigerant lines - up to 165 m, height difference - up to 90 m; the coefficient of joint operation up to 1,3 allows you to reduce the total power of outdoor units
        • Chiller-fan coil systems - optimal for large facilities with an area of 3 000 m²: office centers, hotels, shopping centers; the coolant (water or water-glycol mixture) is distributed by pumps, fan coil units are installed in each room; configuration flexibility is practically unlimited; require a machine room for the chiller and pump group
        • Central air conditioners (TsK) - provide air treatment (cooling, heating, humidification, filtration) as part of the air handling unit; used in sales areas, auditoriums, production facilities; do not provide individual regulation by zones without additional VAV valves
        • Precision air conditioners - for server rooms and data center: maintain temperature with an accuracy of ±0,5 °C, provide round-the-clock operation 24/7 with heat excess up to 100 kW/m²

        How is the heat load on an air conditioning system calculated?

        Calculation of the heat load is the foundation of the SCR project: it determines the power of the equipment and, therefore, the entire cost of the system. Underestimating the load leads to overheating of the premises, overestimating it leads to excessive capital costs and frequent start-up cycles, reducing the life of the compressor.

        AYU-Project calculates the heat load using the following components in accordance with SP 60.13330.2020 Appendix A:

        • Heat gains through building envelopes - determined by the difference in temperatures of external and internal air, area and thermal resistance of structures, taking into account the orientation of facades along SP 131.13330.2020
        • Heat gain from solar radiation - through glazing, taking into account orientation, type of glass, solar shading devices and latitude of construction; one of the key factors for southern and southwestern facades with a large glazing area
        • Heat gains from people - according to standard values of sensible and total heat transfer per person, depending on the type of activity (rest, office work, physical labor) according to GOST 30494-2011
        • Heat gains from lighting and equipment - from lamps (the share that turns into heat), servers, technological equipment; especially significant for data center and production facilities
        • Heat gain from supply air - in buildings with combined heating and air conditioning systems, the supply air during the warm period carries an additional heat load, which is distributed between the ventilation systems and SCR
        • Final selection of equipment - based on the calculation results, AYU-Project generates a technical specification for the selection of equipment indicating the cooling capacity, coolant temperature range and energy efficiency class

        Typical mistakes in designing air conditioning systems

        A significant part of the complaints against air conditioning systems in already operating buildings are the result of errors made precisely at the DD stage, and not during installation. AYU-Project excludes them due to mandatory double standard control of calculations and BIM coordination.

        • Underestimation of heat gains from solar radiation - the most common mistake for glazed office facades; when calculating without taking into account the orientation of the building, the load on AC system is underestimated by 20-35%, which leads to overheating in the summer
        • Heat transfer from fan coil fans and precision air conditioners is not taken into account - fan power is the excess heat in the room; when summing up the loads, its omission leads to an underestimation of the required cooling capacity
        • Combining zones with different modes into one VRF branch - the northern and southern rooms of the same floor have opposite regimes: some require cooling, others require heating; combining into one system without a four-pipe circuit or systems with heat recovery is unacceptable
        • Ignoring Refrigerant Route Restrictions - exceeding the standard length of the VRF system route (manufacturers limit it to 150-165 m) reduces system performance and violates warranty obligations; AYU-Project respects manufacturer restrictions
        • Lack of drainage schemes - in WD, without detailed drainage pipelines, condensate from the internal units ends up on the ceiling structures; AYU-Project studies the drainage of each block in axonometric diagrams
        • Inconsistency of AC system with ventilation - if the air conditioning system and ventilation system are designed independently, the thermal loads are duplicated or contradict each other; AYU-Project designs HVAC as a single complex

        Integration of air conditioning systems with building engineering systems

        The air conditioning system is not autonomous: its efficiency is 30-40% determined by the quality of its interface with ventilation, heating, power supply and automation. AYU-Project designs AC system in conjunction with all adjacent sections with the issuance of joint tasks at the DD stage.

        Integration with ventilation and heating

        For office buildings and shopping mall AYU-Project designs four-pipe fan coil systems that allow you to simultaneously cool some areas and heat others - this is especially important in the off-season, when the southern facades overheat, and the northern ones still need heat. The heat balance of the building is calculated jointly according to sections HVAC and AC system in order to eliminate the competitive operation of air conditioners and heating devices.

        Automation and BMS

        The control of VRF systems and chillers is integrated into the BMS via Modbus, BACnet or KNX protocols. AYU-Project develops algorithms for controlling summer/winter modes, zone operation schedules and emergency blocking based on an APS signal, as well as a task for the automation section (ATC) with signal tables for each ACS circuit.

        Why choose AYU-Project to design air conditioning systems?

        AYU-Project designs AC system as part of an integrated HVAC system: heat load calculation, scheme selection, architecture linking and integration with BMS are performed by one command, which eliminates inconsistencies between sections and expert comments on related solutions.

        Specific benefits:

        • SRO Design Authorization capital construction projects, including technically complex ones
        • Complete calculation set in DD: heat load for each room, comparison of AC system schemes, justification of energy efficiency class - no additional charge
        • BIM design in Revit and MagiCAD: coordination of refrigerant and coolant routes with adjacent sections KR, VK, EO, OV - collisions are eliminated at the DD stage, and not at installation
        • Fixed price contracts: the cost is not revised during the development process
        • Free Revisions in Response to Expert Review Comments: adjustments DD based on the results of the examination are included in the contract
        • Experience Across Projects of Various Scales: from server rooms with precision air conditioning to shopping mall with an area of 30 000+ m² with chiller-fan coil and VRF systems

        What standards govern the design of air conditioning systems?

        The design of AC system is governed by federal codes of practice, sanitary standards and national standards in the field of construction and microclimate. All documents are applied in the version valid on the date of development DD.

        Current list of regulatory documents:

        • Federal Law No. 384-FZ “Technical Regulations on the Safety of Buildings and Structures” from 30.12.2009 (as amended) - establishes general requirements for engineering systems, including AC system
        • SP 60.13330.2020 “Heating, Ventilation and Air Conditioning” (updated edition SNiP 41-01-2003, with Amendments No. 1-5) - the basic set of rules regulating the parameters of the design microclimate, calculation of the heat load, requirements for refrigeration supply and equipment AC system
        • SP 131.13330.2020 “Construction Climatology” (updated version SNiP 23-01-99*) - calculated parameters of outdoor air (temperature, humidity, solar radiation) for the warm and cold periods of the year
        • GOST 30494-2011 “Residential and Public Buildings. Indoor Microclimate Parameters” - standardized values of temperature, humidity and air speed in the service area; basis for setting design parameters of SCR
        • SanPiN 1.2.3685-21 “Hygienic standards and requirements for ensuring the safety and (or) harmlessness of environmental factors to humans” - permissible microclimate parameters in workplaces, standard values for residential and public buildings
        • Decree of the Government of the Russian Federation No. 87 from 16.02.2008 (ed. 2023) “On the composition of sections of project documentation” - regulates the composition of subsection IOS 5.4 (HVAC) at stage DD, including refrigeration and air conditioning
        • GOST R 58274-2018 (EN 14511-1-4:2013) “Air conditioners, liquid coolers and heat pumps” - test methods and classification of equipment used in the design of AC system
        • SP 50.13330.2012 “Thermal protection of buildings” - characteristics of enclosing structures used in calculating heat input into rooms through walls and coverings
        • GOST 12.1.005-88 “General sanitary and hygienic requirements for air in the working area” - standardization of air parameters at production facilities, which determines the requirements for technological air conditioning
        • SP 54.13330.2022 “Residential multi-apartment buildings”, SP 118.13330.2022 “Public buildings and structures” - special microclimate requirements for residential and public buildings, respectively

        Air-conditioning design scope and schedule

        The scope and schedule for air-conditioning design documentation and working documentation are determined by system-specific factors:

        • Type of selected SCR scheme - the project of a VRF system, a chiller-fan coil system and precision air conditioning data center fundamentally differ in the complexity of the calculations and the volume WD
        • Number of air conditioning zones and indoor units - each zone requires a separate calculation of the thermal load and selection of equipment; for VRF systems - calculation of route lengths and collaboration coefficient
        • Availability of engine room - for chiller-fan coil systems, it is necessary to study the layout IHS/MO, hydraulic calculations, tasks KR and EL
        • Requirements for integration with BMS - development of signal tables, control algorithms and automation circuits increases the volume of WD
        • Special microclimate requirements - medical facilities, clean rooms, data center require an expanded range of calculations and approvals
        • Design stage - only DD, only WD or combined development DD+WD

        Approximate calculation - through the online calculator on the website.

        To prepare an accurate commercial proposal, the application must indicate: the type and function of the facility, the total area of ​​air-conditioned premises, preferences for the AC system scheme (if any), the presence of a machine room or restrictions on the placement of outdoor units, the design stage (DD, WD or DD+WD). The initial consultation is free, and we work across Russia remotely.

        How to order the design of an air conditioning system in AYU-Project?

        1. Application Submission
          Fill out the form on the website or send a request by e-mail indicating the type of facility, the area of air-conditioned premises and the approximate scheme of the air conditioning system. Attach architectural plans if they are already ready.
        2. Initial consultation
          The AYU-Project engineer analyzes architectural solutions, facade orientation, the presence of a machine room and specific microclimate requirements. If necessary, offers a comparison of two or three options for the AC system scheme. Consultation is free.
        3. Preparation of a commercial proposal
          AYU-Project forms CP with a fixed price, the composition of design documentation sections and/or WD, a list of calculations (heat load, hydraulics, automation) and deadlines for the stages.
        4. Conclusion of an agreement
          The contract fixes the price, terms, composition of documentation and the condition of free edits based on the expert’s comments. Advance - only after signing the contract.
        5. Collection of Source Data
          AYU-Project generates a checklist of initial data for section AC system: architectural and construction part with plans, sections and facades, glazing specifications, technologist’s assignments (if production or server equipment is available), climate data for SP 131.13330.2020, technical specifications equipment suppliers, subject to preference.
        6. Development of DD and/or WD
          AYU-Project engineers calculate the heat load for each room, select and agree with the customer on the HVAC scheme, and assemble the system in BIM. Interim versions are provided for review at each stage.
        7. Expert Review Support and Documentation Delivery
          AYU-Project responds to the expert’s comments on section HVAC (AC system) without additional payment, makes adjustments and transfers the final set to WD for work and commissioning.

        Read more
        Engineering Design Calculator

        Estimate Your Project Budget

        Enter the project parameters and scope of work to receive a preliminary cost range in a few steps.

        Calculate Project Cost
        Cost estimate

        Get a tailored project cost estimate.

        Leave your phone number and briefly describe the project. You can attach the Terms of Reference.

        * Fields marked with an asterisk are required
        Another file
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        Change picture

        Our Advantages

        Consistently High Quality When developing design documentation, we are guided by the provisions of GOST, building codes (SN) and building codes and regulations (SNiP), departmental building codes (BCN), state and industry standards.
        Team of professionals Each specialist regularly undergoes training and advanced training courses. All our specialists are highly specialized, each is a professional in their field, which guarantees impeccable quality.
        Impeccable business reputation Our projects, among other things, were developed for the needs of Russian Railways, PJSC Rosseti Siberia, Federal Grid Company, NTEC, Permtransgaz, Ministry of Digital and Technological Development of the Sakhalin Region, State Public Institution KK Digital Kuban, Ministry of Digital Development of the Krasnoyarsk Territory, Ministry of Education and Youth Policy of the Sverdlovsk Region.

        How We Work

        01
        Step
        We review the facility
        Our engineers review the available documents, assess the facility and prepare the scope for commercial evaluation.
        02
        Step
        We prepare a commercial proposal
        Based on the agreed scope and fixed internal rates, we calculate the required work and prepare a transparent proposal.
        03
        Step
        We sign the agreement
        Our contracts define responsibilities, deadlines, deliverables and approval procedures clearly, balancing client interests and project requirements.
        04
        Step
        We deliver the documentation
        A responsible project lead coordinates the work with the client and keeps the documentation process under control through to delivery.

        Frequently Asked Questions

        • Air conditioning system design
        How does the energy efficiency class of a building influence the choice of air conditioning scheme?

        Buildings of class A and A+ require the use of systems with a high seasonal energy efficiency coefficient SCOP and SEER - not lower than 4,0 for most climatic zones of Russia. Modern generation VRF systems provide SEER up to 7-8 due to inverter compressor control and heat recovery between zones. AYU-Project justifies the choice of scheme in the energy efficiency section of PD with the calculation of annual electricity consumption for cooling needs.

        What equipment is used in air conditioning systems for medical institutions?

        For medical facilities, primarily operating rooms and intensive care units, fan coil units with HEPA filters and laminar ceilings with air supply at a speed not exceeding 0,1-0,15 m/s in the working area are used. The system must ensure that excess pressure is maintained in the operating room relative to the corridor. All decisions are formed according to SanPiN 2.1.3678-20.

        Is it possible to combine air conditioning and ventilation systems into one unit?

        Yes - this is a central air conditioner (supply unit with a built-in cooler or connected to a chiller). It supplies treated air to the room: heated or cooled to the required temperature, with the required humidity. Disadvantage: lack of individual regulation for zones without VAV valves; plus - a single system providing both ventilation and air conditioning. AYU-Project selects the optimal scheme based on the ratio of cost and performance characteristics.

        Is a refrigeration machine (chiller) required for a chiller-fan coil system?

        Yes. Chiller is a central refrigeration machine, an essential element of the system; without it, fan coil units operate only in heating mode (from the boiler room). The chiller is installed in the engine room or on the roof and requires working out the connection to the power supply, water supply (for evaporative cooling of the condenser) and process piping systems.

        How is air conditioner power calculated for a server room?

        The thermal load for a server room is determined by the sum of the power consumption of IT equipment (servers, storage systems, network equipment) plus the heat emission of the fans of the precision air conditioners themselves. It is the heat emission of the air conditioner’s own fans that is the most often missed component, which can amount to 4-6% of the total power of the installation. AYU-Project takes this component into account in the calculation to eliminate undercooling.

        Is it necessary to undergo an examination if air conditioning is added during reconstruction?

        If the reconstruction affects load-bearing structures, engineering systems or the area of ​​the building, the PD as part of the OV section must undergo an expert review. When redeveloping without changing design parameters, you can limit yourself to RD without PD, but the decision is made individually based on the results of consultation with AYU-Project.

        How does a VRF system differ from a multi-split system?

        Multisplit - several indoor units connected to one outdoor unit, without the possibility of simultaneous heating and cooling in different zones. The VRF system provides control of refrigerant flow (Variable Refrigerant Flow) for each indoor unit independently, supports simultaneous operation in cooling and heating modes (in three-pipe circuits) and serves up to 64 indoor units from one outdoor module. These are fundamentally different classes of systems in terms of scale and functionality.

        Is it possible to install a VRF system in a residential building with a height of more than 28 floors?

        Technically, yes, subject to the manufacturer’s restrictions on the length of the refrigerant lines and the height difference. However, for MKD above 28 m, it is necessary to coordinate the placement of outdoor units with the architectural requirements for facades and take into account fire breaks. AYU-Project work on these issues at the PD stage together with the architectural section.

        Licences and Certificates

        Notice of tax registration of individual entrepreneur Anastasia Sergeevna Ayupova
        Certificate of Anastasia Sergeevna Ayupova authorising the design of fire-safety systems for buildings and structures in operation
        NOPRIZ Certificate
        OPORA RUSSIA Certificate

        Testimonials

        Explore This Section

        Related services

        Services that complement the project.

        01 BIM design 02 Architectural and construction solutions 03 Engineering Systems Automation and Supervisory Control Design 04 Ventilation system 05 Smoke removal system
        About Us
        Employees
        Licenses
        Contacts
        Payment and warranties
        Special Offers
        Vacancies
        Become a Partner
        +7 (383) 375-74-77
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        info@ayu.group
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Consent to personal data processing
        Privacy Policy · Cookie Policy
        Site map
        en
        ru
        en
        { "@context": "https://schema.org", "@type": "Service", "name": "Air conditioning system", "description": "Incorrectly calculated heat load is the main reason why air conditioners in a newly built building cannot cope with cooling on a hot day or “drive” extra kilowatts in winter: an error of 15-20% when selecting equipment is already established at the design stage. AYU-Project designs air conditioning systems (ACS) for facilities of any function and scale: we calculate the heat load taking into account the area of ​​the premises, heat gain from peop", "provider": { "@type": "Organization", "name": "AYU-Project", "url": "https://www.ayu.group/" }, "areaServed": "Russia", "url": "https://www.ayu.group/en/otoplenie-ventilyacziya-i-kondiczionirovanie/sistema-kondiczionirovaniya/" }