Cookies and analytics

Essential cookies are used to operate the website and its forms. Analytics will be enabled only after your consent. Read the Cookie Policy.

Font size
Background and font color
Images
Text scoring
Regular version of the site
AYU
engineering systems design company
+7 (383) 375-74-77
+7 (383) 375-74-77
+7 (923) 235-74-77
Email
info@ayu.group
The address
Novosibirsk, st. Bolshevistskaya, 35, office. 316
Working hours
Mon-Fri: 09:00-18:00
Areas of Expertise
  • Extra-Low-Voltage Systems Design
    • Access Control and Management System (ACS)
    • Security and Intrusion Alarm System (SOTS)
    • Video Surveillance System (SVN)
    • CCTV System (SOT)
    • Intrusion Alarm System (SOS)
    • Intercom (DF)
    • Perimeter security alarm (TSOP)
  • BIM development
    • BIM Model Development
    • BIM design
  • Power supply systems design
    • Cable and Overhead Power Lines, 0.4-10 kV
    • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
    • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
    • Electricity metering system
    • Power equipment design
    • Lighting design
    • Lightning protection and grounding design
  • Communication Network Design
    • Fiber-Optic Communication Lines (FOCL)
    • Structured Cabling Systems (SCS)
    • Local area network (LAN)
    • Public Address and Radio Broadcasting Systems (RRL)
    • Wireless communication networks
    • Telephone and Internet
    • Cellular base stations
    • Power Line Carrier (PLC) Communications
  • Fire Protection Systems Design
    • Fire Alarm System (SPS)
    • Voice Alarm and Fire Evacuation Control System (SOUE)
    • Fire Protection System Automation (FPSA)
    • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
  • Integrated security systems design
    • Technical Security Systems Design (TSOB)
    • Design of Engineering and Technical Security Systems (ITSS)
    • Anti-Terrorism Security
  • Water supply and sewerage
    • External water supply networks
    • Internal water supply systems
    • Drainage systems
    • High-pressure pipeline systems
    • Pumping stations
    • Internal fire water supply
  • Heating, ventilation and air conditioning
    • Smoke removal system
    • Ventilation system
    • Air conditioning system
    • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
  • Architectural Design
    • Architectural design
    • Architectural and construction solutions
  • Structural Design
    • Reinforced concrete structures
    • Precast Reinforced Concrete Products
    • Steel Structures
    • Detailed Steelwork Drawings
    • Timber Structures
  • Engineering Systems Automation and Supervisory Control Design
About Us
  • Employees
Licenses
Contacts
Calculator
Projects
en
ru
en
Novosibirsk, st. Bolshevistskaya, 35, office. 316
+7 (383) 375-74-77 / +7 (923) 235-74-77
Mon-Fri: 09:00-18:00
en
ru
en
  • Special Offers
  • Payment and warranties
  • Vacancies
  • ...
    AYU
    engineering systems design company
    Areas of Expertise
    • Extra-Low-Voltage Systems Design
      • Access Control and Management System (ACS)
      • Security and Intrusion Alarm System (SOTS)
      • Video Surveillance System (SVN)
      • CCTV System (SOT)
      • Intrusion Alarm System (SOS)
      • Intercom (DF)
      • Perimeter security alarm (TSOP)
    • BIM development
      • BIM Model Development
      • BIM design
    • Power supply systems design
      • Cable and Overhead Power Lines, 0.4-10 kV
      • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
      • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
      • Electricity metering system
      • Power equipment design
      • Lighting design
      • Lightning protection and grounding design
    • Communication Network Design
      • Fiber-Optic Communication Lines (FOCL)
      • Structured Cabling Systems (SCS)
      • Local area network (LAN)
      • Public Address and Radio Broadcasting Systems (RRL)
      • Wireless communication networks
      • Telephone and Internet
      • Cellular base stations
      • Power Line Carrier (PLC) Communications
    • Fire Protection Systems Design
      • Fire Alarm System (SPS)
      • Voice Alarm and Fire Evacuation Control System (SOUE)
      • Fire Protection System Automation (FPSA)
      • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
    • Integrated security systems design
      • Technical Security Systems Design (TSOB)
      • Design of Engineering and Technical Security Systems (ITSS)
      • Anti-Terrorism Security
    • Water supply and sewerage
      • External water supply networks
      • Internal water supply systems
      • Drainage systems
      • High-pressure pipeline systems
      • Pumping stations
      • Internal fire water supply
    • Heating, ventilation and air conditioning
      • Smoke removal system
      • Ventilation system
      • Air conditioning system
      • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
    • Architectural Design
      • Architectural design
      • Architectural and construction solutions
    • Structural Design
      • Reinforced concrete structures
      • Precast Reinforced Concrete Products
      • Steel Structures
      • Detailed Steelwork Drawings
      • Timber Structures
    • Engineering Systems Automation and Supervisory Control Design
    About Us
    • Employees
    Licenses
    Contacts
    Calculator
    Projects
      AYU
      +7 (383) 375-74-77 / +7 (923) 235-74-77
      Areas of Expertise
      • Extra-Low-Voltage Systems Design
        • Access Control and Management System (ACS)
        • Security and Intrusion Alarm System (SOTS)
        • Video Surveillance System (SVN)
        • CCTV System (SOT)
        • Intrusion Alarm System (SOS)
        • Intercom (DF)
        • Perimeter security alarm (TSOP)
      • BIM development
        • BIM Model Development
        • BIM design
      • Power supply systems design
        • Cable and Overhead Power Lines, 0.4-10 kV
        • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
        • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
        • Electricity metering system
        • Power equipment design
        • Lighting design
        • Lightning protection and grounding design
      • Communication Network Design
        • Fiber-Optic Communication Lines (FOCL)
        • Structured Cabling Systems (SCS)
        • Local area network (LAN)
        • Public Address and Radio Broadcasting Systems (RRL)
        • Wireless communication networks
        • Telephone and Internet
        • Cellular base stations
        • Power Line Carrier (PLC) Communications
      • Fire Protection Systems Design
        • Fire Alarm System (SPS)
        • Voice Alarm and Fire Evacuation Control System (SOUE)
        • Fire Protection System Automation (FPSA)
        • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
      • Integrated security systems design
        • Technical Security Systems Design (TSOB)
        • Design of Engineering and Technical Security Systems (ITSS)
        • Anti-Terrorism Security
      • Water supply and sewerage
        • External water supply networks
        • Internal water supply systems
        • Drainage systems
        • High-pressure pipeline systems
        • Pumping stations
        • Internal fire water supply
      • Heating, ventilation and air conditioning
        • Smoke removal system
        • Ventilation system
        • Air conditioning system
        • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
      • Architectural Design
        • Architectural design
        • Architectural and construction solutions
      • Structural Design
        • Reinforced concrete structures
        • Precast Reinforced Concrete Products
        • Steel Structures
        • Detailed Steelwork Drawings
        • Timber Structures
      • Engineering Systems Automation and Supervisory Control Design
      About Us
      • Employees
      Licenses
      Contacts
      Calculator
      Projects
        en
        ru
        AYU
        EN EN
        Telephones
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        Email
        info@ayu.group
        The address
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Working hours
        Mon-Fri: 09:00-18:00
        AYU
        • Areas of Expertise
          • Areas of Expertise
          • Extra-Low-Voltage Systems Design
            • Extra-Low-Voltage Systems Design
            • Access Control and Management System (ACS)
            • Security and Intrusion Alarm System (SOTS)
            • Video Surveillance System (SVN)
            • CCTV System (SOT)
            • Intrusion Alarm System (SOS)
            • Intercom (DF)
            • Perimeter security alarm (TSOP)
          • BIM development
            • BIM development
            • BIM Model Development
            • BIM design
          • Power supply systems design
            • Power supply systems design
            • Cable and Overhead Power Lines, 0.4-10 kV
            • Construction and reconstruction of transformer substations 6-10 kV / 0.4 kV
            • Design of backup, emergency and autonomous power supply systems (solar and diesel substations)
            • Electricity metering system
            • Power equipment design
            • Lighting design
            • Lightning protection and grounding design
          • Communication Network Design
            • Communication Network Design
            • Fiber-Optic Communication Lines (FOCL)
            • Structured Cabling Systems (SCS)
            • Local area network (LAN)
            • Public Address and Radio Broadcasting Systems (RRL)
            • Wireless communication networks
            • Telephone and Internet
            • Cellular base stations
            • Power Line Carrier (PLC) Communications
          • Fire Protection Systems Design
            • Fire Protection Systems Design
            • Fire Alarm System (SPS)
            • Voice Alarm and Fire Evacuation Control System (SOUE)
            • Fire Protection System Automation (FPSA)
            • Automatic fire-extinguishing systems (gas, powder, aerosol, etc.)
          • Integrated security systems design
            • Integrated security systems design
            • Technical Security Systems Design (TSOB)
            • Design of Engineering and Technical Security Systems (ITSS)
            • Anti-Terrorism Security
          • Water supply and sewerage
            • Water supply and sewerage
            • External water supply networks
            • Internal water supply systems
            • Drainage systems
            • High-pressure pipeline systems
            • Pumping stations
            • Internal fire water supply
          • Heating, ventilation and air conditioning
            • Heating, ventilation and air conditioning
            • Smoke removal system
            • Ventilation system
            • Air conditioning system
            • Heating, Air Conditioning, Ventilation and District Heating Networks in Accordance with Government Decree No. 87
          • Architectural Design
            • Architectural Design
            • Architectural design
            • Architectural and construction solutions
          • Structural Design
            • Structural Design
            • Reinforced concrete structures
            • Precast Reinforced Concrete Products
            • Steel Structures
            • Detailed Steelwork Drawings
            • Timber Structures
          • Engineering Systems Automation and Supervisory Control Design
        • About Us
          • About Us
          • Employees
        • Special Offers
        • Payment and warranties
        • Vacancies
        • For partners
        • Licenses
        • Calculator
        • Projects
        • Contacts
        • en
          • Language
          • en
          • ru
        • +7 (383) 375-74-77
          • Telephones
          • +7 (383) 375-74-77
          • +7 (923) 235-74-77
        • Novosibirsk, st. Bolshevistskaya, 35, office. 316
        • info@ayu.group
        • Mon-Fri: 09:00-18:00
        Home
        -
        Fire Protection Systems Design
        -Voice Alarm and Fire Evacuation Control System (SOUE)
        Voice Alarm and Fire Evacuation Control System (SOUE)

        Voice Alarm and Fire Evacuation Control System (SOUE)

        Reliability We guarantee reliable operation of the equipment and timely information in any conditions.
        Integration We integrate the warning system with fire alarms and building automation.
        Comprehensive Scope We design SOUE systems around the layout, occupant flows, and evacuation scenarios.
        Design documentation: from 14 days
        Working documentation: from 22 days
        Price from 50000 roubles
        Start a Project

        We design voice alarm and evacuation control systems that provide timely notification, safe evacuation management and integration with fire alarm, fire-protection automation and suppression systems.

        AYU-Project designs evacuation warning and control systems for residential, commercial and industrial facilities. The scope includes voice messages, visual indicators, evacuation scenarios, zoning and interface logic with related fire-safety systems. A well-designed system supports safe evacuation, reduces injury risk and helps emergency teams manage the first minutes of a fire.

        Why can a poorly designed evacuation warning system fail even when the equipment works?

        A fire warning system may activate, but people may still fail to receive clear instructions: production noise can mask the signal, acoustic calculations may be missing, and sounders may be placed for convenience rather than coverage. In another building, the system may be audible but direct people toward an exit already affected by smoke because alternative evacuation scenarios were not developed. In a third case, the sound level may formally comply with the standard while speech intelligibility remains too low for people to understand the message.

        These situations occur when the evacuation warning system is treated as an extra line in the estimate rather than as an independent life-safety system. AYU-Project designs voice alarm and evacuation control systems in accordance with SP 3.13130.2024, Federal Law No. 123-FZ and current SP 484.1311500.2020 requirements, including Amendment No. 1 from 01.09.2025, with acoustic calculations, correct zoning and detailed evacuation algorithms for each zone.

        System types: how is the right evacuation warning type selected?

        The system type is determined at design-documentation stage based on building function, number of storeys, occupancy and design features. SP 3.13130.2024 retains five types of systems, significantly clarifying the requirements for each of them compared to the previous edition of the document.

        Type 1 SOUE uses an audible warning signal, such as a siren or tone signal. It is used in small single-storey facilities with a uniform functional purpose and a simple layout: small industrial buildings, warehouses with a standardized area, free-standing buildings. The absence of a voice component and zoning is permissible only if all people in the facility are trained to respond to an alarm and the escape routes are obvious.

        Type 2 system - sound notification in combination with light “Exit” alarms above emergency exits. Suitable for most small and medium-sized facilities: small office buildings, retail premises, consumer services facilities. Exit light alarms must operate continuously in standby mode and remain operational when the main power supply is turned off.

        Type 3 system - voice notification with pre-recorded text messages in combination with “Exit” light annunciators. The speech component is fundamentally important: the auditory perception channel under stress works more efficiently than the visual one, and a meaningful message about the direction of evacuation sharply reduces the time people take to make decisions. It is used for medium-sized multi-storey buildings for office, retail and hotel purposes. If there is a decision in the DD to control the emergency control system from the fire post (control room), the possibility of broadcasting additional voice messages by the operator in real time is provided.

        Type 4 system - speech and light warning with the division of the building into warning zones, with controlled light indicators of the evacuation direction (capable of changing the displayed direction) and with the organization of feedback between warning zones and the fire station. For each zone, several evacuation scenarios are provided depending on the location of the fire. It is used for large shopping and shopping and entertainment centres, hotels, multifunctional complexes, business centres of class A and B.

        Type 5 system - the most complex and functionally complete system: voice and light warning with zoning, controlled signs, several evacuation scenarios for each zone, feedback from each zone to monitor the progress of evacuation and unified control of all zones from the central console. SP 3.13130.2024 additionally provides for type 5 SOUE the ability to address broadcast messages to individual zones and control light signs with the display of dynamically changing routes depending on the current situation. It is used for high-rise buildings, large transport facilities, medical institutions, and facilities with large numbers of people.

        What has changed in SP 3.13130.2024 compared to the previous edition?

        SP 3.13130.2024 radically updated the regulatory framework for the design of SOUE - a document adopted to replace SP 3.13130.2009, has addressed long-standing gaps in acoustics, zoning and system sustainability requirements. The use of an outdated edition when designing new facilities is a violation and will result in expert-review comments.

        Fundamental changes in the new edition:

        • Acoustic requirements became more specific: instead of the sound level “not less than 75 dBA at a distance of 3 m from the siren”, a standard for A-corrected sound level directly in the area where people are located - not less than 75 dBA and not more than 120 dBA at any point in the protected room, when the background noise is exceeded by not less than 15 dBA. Separate standards have been established for sleeping quarters;
        • Speech intelligibility requirements: a standard has been introduced for the voice notification frequency band (200-5000 Hz) and requirements for multiple duplication of messages;
        • Resistance to single faults: a single failure of the communication line should not disrupt the operation of EVAC in more than an area of ​​2 000 m² within one floor and in more than one warning zone;
        • Evacuation algorithms: for EVAC with voice alarms, the number of evacuation scenarios from each zone is not less than the number of evacuation exits from it; the total number of scenarios is not less than the number of warning zones;
        • Personal notification devices for people with limited mobility (people with reduced mobility) are allocated in a separate section of requirements.

        Acoustic calculation: without it, the design cannot be justified

        Acoustic calculation is a mandatory calculation part of the evacuation warning design documentation of any type with speech and sound annunciators: without it it is impossible to confirm the compliance of the design solution with the requirements of SP 3.13130.2024. The calculation is performed for each room (or typical group of rooms) and solves three interrelated problems.

        Task 1: Determination of sound pressure level at design points. For each siren, the sound pressure level at the border of its coverage area is determined, taking into account attenuation in the air, the influence of reflective and absorbing surfaces. At points where the coverage areas of several sounders overlap, the levels are summed up according to a logarithmic law. Calculation points are selected in the most remote and acoustically shielded areas of the room.

        Task 2: Check for excess background noise. Background noise in a room is defined as the average value under typical operating conditions of the facility (for industrial premises - with operating technological equipment). The design signal level of the siren must exceed background noise by at least 15 dBA. If a room can simultaneously operate in several modes with different noise levels, the calculation is performed for the worst case.

        Task 3: Selecting the type and power of sirens, determining the number of sirens in the zone. Based on the results of tasks 1 and 2, the type of sounder (wall-mounted, ceiling-mounted, horn for industrial premises) with a standardized sound pressure characteristic is selected and the minimum required quantity is determined to ensure the required level at each point in the zone. The results of the acoustic calculation are documented as a mandatory annex to the DD.

        SOUE zoning and notification priority

        Dividing the building into warning zones is a key space-planning solution for the EVAC 3-5 types. A warning zone is a part of a building in which EVAC broadcasts the same message simultaneously in the event of a fire. The boundaries of the zones are set based on the planning structure of the building, the flow of people, the location of emergency exits and the capacity of each zone.

        The order (sequence) of triggering alerts by zone is one of the tools for managing evacuation at large facilities. It is not always optimal to launch an alert throughout the entire building at the same time: at transport hubs, in large shopping centers and high-rise buildings, simultaneous launch creates uncontrollable peak flows along evacuation routes and blocks exits. SP 3.13130.2024 regulates a special notification sequence for the 4-type and 5-type fire alarm system: the size of zones, the order of their activation and time delays between the launches of adjacent zones are determined by an algorithm based on the calculation of the time of safe evacuation in accordance with GOST 12.1.004 And SP 1.13130.2020.

        Signal lights and evacuation direction signs

        The light component of EVAC begins with the “Exit” sign and ends with controlled, addressable light signs for the direction of evacuation - between these two extreme points there is a fundamental difference in engineering solutions and regulatory requirements.

        Signal lights "Exit" - LED signs that are constantly lit or flashing during an alarm, placed above each emergency exit and in places where the direction of the evacuation route changes. They require autonomous power supply (at least 1 hour when the main power supply is turned off). Mandatory starting from Type 2 system.

        Illuminated direction indicators - placed on escape routes in places where the direction of movement is not obvious: in long corridors, at T-shaped forks, in the presence of several exits with unequal accessibility. For Type 3 system - static (constantly indicate a single direction). For EVAC 4 and 5 types - controlled: capable of changing the indicated direction at the command of the control system depending on the fire scenario, which is critical if one of the exits is unavailable due to smoke or fire.

        Photoluminescent evacuation systems (FES) - do not belong to the active components of EVAC, but are designed together with it as a passive element for marking escape routes in the event of a power failure. Requirements for FES are specified in accordance with GOST R 12.2.143.

        Integration of SOUE with SPS, ASPS and building engineering systems

        Modern EVAC is not an independent system with a separate start - it is controlled from FAS through FPSA according to the algorithm fixed in DD. The primary “Fire” signal in the zone FAS control zone is generated by FPSA and broadcasts the start command EVAC for the corresponding warning zone. The interaction algorithm is prescribed in the control matrix and is a mandatory part of WD.

        Integrated systems and functions:

        • FAS - source of the “Fire” signal with identification of the ZKSPS; for SOUE types 4-5 - a source of information about the localization of the outbreak for choosing an evacuation scenario;
        • FPSA - a controller that transmits commands for launching and controlling warning zones, changing scenarios and controlling light indicators;
        • Smoke ventilation system - simultaneously with the start of the alert, a command is generated to open the smoke exhaust valves in the fire zone and close the fire suppression valves, which ensures smoke safety of escape routes;
        • ACS - unlocking electromagnetic locks at emergency exits when an alarm signal is received;
        • Elevators - transfer to the “Fire danger” mode and return to the main landing floor;
        • BMS - displaying the status of all warning zones and controlling the system from a central control station;
        • Emergency lighting system - automatic activation during a fire alarm to ensure the standard level of illumination on evacuation routes.

        What is included in the design documentation and working documentation on the SOUE?

        Documentation is developed in accordance with Government Decree of the Russian Federation No. 87 dated 16.02.2008 No. 87 (as amended on 21.10.2025) “On the composition of sections of project documentation and requirements for their content”, SP 3.13130.2024 And SP 484.1311500.2020 (Change No. 1 from 01.09.2025).

        Design documentation stage includes:

        • an explanatory note justifying the type of SOUE and the design decisions taken;
        • zoning scheme for the building into warning zones with justification of boundaries;
        • evacuation algorithms for each zone for each fire scenario;
        • acoustic calculation with confirmation of standardized sound pressure levels at design points;
        • description of control algorithms EVAC from FAS through FPSA;
        • calculation of autonomous power supply for sirens and control devices.

        Working Documentation Stage (WD) contains:

        • block diagram EVAC with designation of control devices, warning zones, sirens and light indicators;
        • plans for the placement of sound, voice annunciators and light signs with reference to construction axes and installation height marks;
        • circuit diagrams of warning lines;
        • interaction matrix EVAC - FAS - FPSA (which signal from which FAS control zone activates which warning zones and according to which scenario);
        • control circuits for light indicators for each evacuation scenario (for EVAC 4-5 types);
        • cable log and cable line tracing;
        • power supply diagram with calculation battery bank for autonomous mode (≥ 24 h standby mode + 1 h alarm);
        • specifications of equipment and materials;
        • statement of quantities.

        Regulatory design basis EVAC

        • SP 3.13130.2024 - basic set of rules: requirements for EVAC types, acoustic parameters, zoning, evacuation algorithms, feedback, fault tolerance;
        • Federal Law No. 123-FZ “Technical regulations on fire safety requirements” - Art. 84: acceptable methods of notification, requirements for warning systems;
        • SP 486.1311500.2020 - a list of objects to be equipped with EVAC, indicating the minimum required type;
        • SP 484.1311500.2020 (Change No. 1 from 01.09.2025) - requirements for interaction of EVAC with FAS and FPSA;
        • SP 1.13130.2020 - evacuation routes and exits; calculation of safe evacuation time;
        • GOST 12.1.004-91 - calculation of individual fire risk; used to substantiate algorithms for the order of starting zones;
        • GOST R 12.2.143-2009 - photoluminescent evacuation systems;
        • EAEU Technical Regulation 043/2017 - requirements for assessing the conformity of fire alarms;
        • GOST R 21.1101-2020 - requirements for registration of WD;
        • Government Decree of the Russian Federation No. 87 dated 16.02.2008 No. 87 (as amended on 21.10.2025) “On the composition of sections of project documentation and requirements for their content.”

        Pricing and how to order

        The cost of developing design documentation and working documentation on EVAC is determined by the type of system (1-5), the area and number of floors of the facility, the number of warning zones and the complexity of evacuation algorithms. With the simultaneous design of EVAC, FAS, FPSA and AFS under a single contract, cost reduction is provided due to the combined development of control matrices. Approximate calculation - using the online calculator on the website.

        How to order design of SOUE

        1. Submit an enquiry - the consultation is free
          Form on the website or phone: +7 (383) 375-73-77 / +7 (923) 743-73-77. Indicate the type and purpose of the facility, area, number of floors, presence of rooms with special acoustic conditions or MGN. When ordering SOUE, SPS, ASPS and AUP at the same time, the cost will be reduced.
        2. Receive a Commercial Proposal Within 1 Business Day
          CP with the scope of work, cost and deadlines. The cost is determined by the type EVAC (1-5), area, number of warning zones and complexity of evacuation algorithms.
        3. Analysis of initial data and signing of an agreement
          Checking plans, purpose of premises, capacity, acoustic features and composition of adjacent systems. Clarification of the background noise level in industrial premises.
        4. Determination of the type of SOUE and zoning
          Type determination (1-5) according to SP 486.1311500.2020. Zoning taking into account the flow of people and emergency exits. For 4-5 types - script algorithms and zone launch order. Coordination of the concept with the customer.
        5. Acoustic calculation
          Calculation of sound pressure levels at design points. Checking the excess of background noise ≥ 15 dBA. Normalization of the range ≥ 75 and ≤ 120 dBA. Speech intelligibility (200-5000 Hz). Calculation for sleeping quarters and people with reduced mobility according to separate standards.
        6. Design Documentation (DD) Development
          Explanatory note, zoning diagram, evacuation algorithms by zones and scenarios, acoustic calculation as an application, control algorithms from SPS/ASPS, battery calculation. Standard control according to SP 3.13130.2024 before transfer.
        7. WD development, regulatory review and transfer. Expert-review support
          Structural diagram, plans for the placement of sirens and light indicators, schematic diagrams, interaction matrix SOUE - SPS - ASPS, control diagrams for indicators according to scenarios, cable log, battery calculation, specifications, work statement. Transfer to PDF and DWG. Support through expert review is free.

        To receive an accurate commercial proposal, leave a request: indicate the facility type and purpose, its area, number of floors and the presence of premises with special acoustic conditions (production halls, sleeping quarters, people with reduced mobility). The initial consultation is free, and we work across Russia remotely.


        Read more

        Voice Alarm and Evacuation Control System (EVAC) and Automatic Fire Alarm System (AFAS) Design Cost

        Scope of Work Cost, rub.
        Site inspection Negotiable
        Preparation of a commercial proposal (cost estimate) Negotiable

         

        Area, m2 Types 1-2, ₽ Type 3, ₽ Types 4-5, ₽ Anti-Terrorism Security, ₽
        to 200 13 000 15 600 22 500 39 000
        201 - 400 15 500 18 500 26 500 42 000
        401 - 700 18 200 21 900 31 500 45 000
        701 - 1000 21 700 25 900 37 400 55 500
        1001 - 2000 28 000 32 000 42 000 61 500
        2001 - 3000 32 000 37 000 54 000 66 000
        3001 - 5000 38 000 45 000 65 000 73 500
        5001 - 7000 43 300 52 000 74 800 97 500
        7001 - 10000 56 300 67 500 97 300 108 000
        10001 - 13000 69 300 83 200 119 700 112 500
        13001 - 17000 82 300 98 700 142 200 117 000
        17001 - 21000 95 300 114 300 164 500 122 500
        21001 - 25000 108 300 129 900 187 000 147 000

        The cost of SOUE design is indicated without the cost of SPS, Here view and calculatefire alarm system (FAS) design cost. 

        Show full table
        Engineering Design Calculator

        Estimate Your Project Budget

        Enter the project parameters and scope of work to receive a preliminary cost range in a few steps.

        Calculate Project Cost
        Cost estimate

        Get a tailored project cost estimate.

        Leave your phone number and briefly describe the project. You can attach the Terms of Reference.

        * Fields marked with an asterisk are required
        Another file
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        System field AYU Analytics. Filled in automatically only if you agree to analytics.
        Change picture

        Our Advantages

        Consistently High Quality When developing design documentation, we are guided by the provisions of GOST, building codes (SN) and building codes and regulations (SNiP), departmental building codes (BCN), state and industry standards.
        Team of professionals Each specialist regularly undergoes training and advanced training courses. All our specialists are highly specialized, each is a professional in their field, which guarantees impeccable quality.
        Impeccable business reputation Our projects, among other things, were developed for the needs of Russian Railways, PJSC Rosseti Siberia, Federal Grid Company, NTEC, Permtransgaz, Ministry of Digital and Technological Development of the Sakhalin Region, State Public Institution KK Digital Kuban, Ministry of Digital Development of the Krasnoyarsk Territory, Ministry of Education and Youth Policy of the Sverdlovsk Region.

        How We Work

        01
        Step
        We review the facility
        Our engineers review the available documents, assess the facility and prepare the scope for commercial evaluation.
        02
        Step
        We prepare a commercial proposal
        Based on the agreed scope and fixed internal rates, we calculate the required work and prepare a transparent proposal.
        03
        Step
        We sign the agreement
        Our contracts define responsibilities, deadlines, deliverables and approval procedures clearly, balancing client interests and project requirements.
        04
        Step
        We deliver the documentation
        A responsible project lead coordinates the work with the client and keeps the documentation process under control through to delivery.

        Projects

        2023 · Fire safety
        Fire Protection Systems Design for the Snezhinka Center
        2024 · Fire safety, Communication networks, Security systems
        Security and Communication Systems for the Residential Complex in Vasilyevo
        2024 · Electrical supply, Extra-low-voltage systems, Security systems
        Perimeter signaling of the Stavropol airport terminal
        2024 · Fire safety
        Fire Protection Systems Design for the Kovykta Field
        2025 · Security systems, Fire safety
        Integrated security systems for Sakhalin customs facilities

        Frequently Asked Questions

        • Voice Alarm and Fire Evacuation Control System (SOUE)
        How does EVAC remain operational if the main power supply fails?

        SP 3.13130.2024 and SP 484.1311500.2020 (Change No. 1) require the SOUE to remain operational if the main power supply fails: for at least 24 hours in standby mode and at least one hour in alarm mode. Redundancy is provided by built-in rechargeable batteries (AB) in control devices and amplifiers or by a centralized backup power source. Calculation of the battery capacity taking into account the power consumption of all sirens, amplifiers and control units in both modes is mandatory and is included in the DD. For facilities with a large number of people, an additional provision is made for automatic input of a reserve (AVR) from a second independent input of power supply.

        What source data are required to begin EVAC design?

        Minimum required set: floor architectural plans with explication of premises and indication of heights; functional purpose of the building and each room; capacity data (number of people by zone); the presence of premises with special acoustic conditions (production halls with process noise, sleeping quarters, rooms for MGN); composition of related systems (SPS, ASPZ, BMS). During reconstruction - current PD and information about installed equipment. The level of background noise in production premises is either from technological documentation or measured on site. Our engineers will clarify the required composition of the starting materials during a free consultation.

        How long does it take to develop design documentation and detailed design documentation for a fire alarm and evacuation management system (FAEMS)?

        For a facility of medium complexity (5 000-10 000 m², 3-5 warning zones, SOUE 3 type) - 2-3 weeks PD and 3-4 weeks RD. For large facilities with SOUE 4-5 type (multi-zone systems, script algorithms, controlled pointers) - individually. When combined with SPS and ASPZ development, timelines are reduced due to parallel work on control matrices. All terms are fixed in the contract.

        Can SOUE be used as a background audio or announcement system at the same time?

        Yes, such a combination is allowed. Equipment certified to TR EAES 043/2017 for use in SOUE can be used to broadcast background music and announcements as normal - with automatic priority interruption of any playback in the event of a fire alarm. This is a popular solution for shopping centers, hotels and business centers: one set of equipment combines the functions of SOUE and a sound system, which reduces capital costs. Condition: equipment in SOUE mode must provide standardized acoustic parameters - this fact is confirmed by acoustic calculations as part of the PD.

        Is feedback to warning zones necessary and what does this mean in practice?

        For fire alarm and evacuation management system (FAEMS) 4 and 5 types, feedback is a regulatory requirement of SP 3.13130.2024. In practice, this means: the operator at the fire station sees on the control panel the status of each warning zone - whether the warning is working there, whether a confirmation signal is being received from the equipment in the zone. For the 5 type, it is also possible to obtain information about the response actions of people in the zones - through intercoms or individual MGN warning devices.

        Is voice notification necessary or can we limit ourselves to sirens?

        The siren can be limited only to SOUE 1 type - in small one-story buildings with a simple layout. For all other facilities where the layout is more complex than one hall, voice notification is mandatory. The reason is normative and psychophysiological at the same time: the siren signals danger, but does not tell where to run. A person under stress acts along the usual route, and not along the optimal one from a safety point of view. A voice message indicating a specific exit dramatically reduces the start time for evacuation and reduces the likelihood of people congesting at one exit.

        How is the SOUE type determined for a specific building?

        The SOUE type is determined by SP 486.1311500.2020, which sets the minimum required type for each functional class of buildings. Key factors: functional purpose (housing, trade, offices, industry, transport), number of floors, one-time capacity, availability of premises with low-mobility groups of the population (MGN). In some cases, the designer will justifiably accept a higher type than the minimum required - when this provides a safer and more controlled evacuation at a slight increase in cost.

        How is SP 3.13130.2024 different from SP 3.13130.2009?

        There are several fundamental changes. Firstly, acoustic requirements are now standardized at design points inside the room, and not “at a distance of 3 m from the siren” - this is a more strict and engineering-correct approach. Secondly, requirements have been introduced for speech intelligibility and the frequency band of voice annunciators (200-5000 Hz). Thirdly, a standard has been introduced for the stability of the system to single faults of communication lines: the failure of one line should not disable more than 2 000 m² within one floor. Fourthly, for SOUE with voice annunciators, the number of evacuation scenarios is normalized through the number of zones and exits. The project written using SP 3.13130.2009 for a new facility does not comply with current standards.

        Licences and Certificates

        Notice of tax registration of individual entrepreneur Anastasia Sergeevna Ayupova
        Certificate of Anastasia Sergeevna Ayupova authorising the design of fire-safety systems for buildings and structures in operation
        NOPRIZ Certificate
        OPORA RUSSIA Certificate

        Testimonials

        Explore This Section

        Related services

        Related solutions and services in this area.

        01 Engineering Systems Automation and Supervisory Control Design 02 Fire Protection System Automation (FPSA) 03 Automatic fire-extinguishing systems (gas, powder, aerosol, etc.) 04 Public Address and Radio Broadcasting Systems (RRL) 05 Fire Alarm System (SPS)
        About Us
        Employees
        Licenses
        Contacts
        Payment and warranties
        Special Offers
        Vacancies
        Become a Partner
        +7 (383) 375-74-77
        +7 (383) 375-74-77
        +7 (923) 235-74-77
        info@ayu.group
        Novosibirsk, st. Bolshevistskaya, 35, office. 316
        Consent to personal data processing
        Privacy Policy · Cookie Policy
        Site map
        en
        ru
        en
        { "@context": "https://schema.org", "@type": "Service", "name": "Voice Alarm and Fire Evacuation Control System (SOUE)", "description": "We design voice alarm and evacuation control systems that provide timely notification, safe evacuation management and integration with fire alarm, fire-protection automation and suppression systems. AYU-Project designs evacuation warning and control systems for residential, commercial and industrial facilities. The scope includes voice messages, visual indicators, evacuation scenarios, zoning and interface logic with related fire-safety systems. ", "provider": { "@type": "Organization", "name": "AYU-Project", "url": "https://www.ayu.group/" }, "areaServed": "Russia", "url": "https://www.ayu.group/en/proektirovanie-sistem-protivopozharnoy-bezopasnosti/soue/" }