AYU-Project completed an automatic fire alarm and warning project for 35 temporary modular buildings as part of the 12th stage of development of the Kovykta gas condensate field - one of the largest gas fields in Russia, forming the resource base for the Power of Siberia gas pipeline.
Client
The project was carried out by order of JSC StroyTransNefteGaz, the general contractor involved in the development of the Kovykta gas condensate field.
Facility
The design object was temporary modular buildings on the territory of the shift-worker accommodation camp at gas treatment unit-1 - an integrated gas treatment installation. The deposit is located in the Irkutsk region, on the territory of the Zhigalovsky and Kazachinsko-Lensky districts.
Scope of design work
AYU-Project engineers designed an automatic fire alarm system and a fire warning and evacuation control system for 35 temporary modular buildings of the complex. When choosing equipment, the distance of the facility from service centers and the long heating period were taken into account, which determined the requirements for the reliability and maintainability of the technical solutions included in the project.