AYU-Project developed working documentation for the overhaul of power supply and extra-low-voltage systems at the multilateral 24-hour border checkpoint at Mineralnye Vody International Airport, a facility supporting continuous passenger and freight traffic in southern Russia.
Client
The work was carried out for the Mineralnye Vody International Airport as part of the renovation of premises intended to accommodate an air cargo-passenger checkpoint across the state border of the Russian Federation.
Facility
The object of the design was the premises of a 24-hour checkpoint on the territory of the Mineralnye Vody airport in the Stavropol Territory - a facility with a continuous operation mode and increased requirements for the redundancy of engineering systems.
Scope of design work
AYU-Project specialists have developed working documentation for the overhaul of the power supply system, lighting system, extra-low-voltage systems and uninterruptible power supply system. The joint design of the power and low-current parts made it possible to provide redundant power for communication equipment, video surveillance and inspection systems, which is critical for a facility that operates without interruptions for border crossings.