AYU-Project has prepared sections of design documentation for power supply and communication networks for the infrastructure complex of rotational camps “Metallurg” and “Gornyak”, which are being built as part of the construction of a mining and processing plant on the basis of the Klyuchevskoye gold deposit.
Client
The project was carried out by order of JSC Zapadnaya-Klyuchi Mine, a subsoil user developing the Klyuchevskoye gold deposit.
Facility
The objects of design were the buildings of dormitories for rotational camps "Metallurg" (accommodation for engineering and technical staff for 100 places and workers for 120 places) and "Gornyak" (accommodation for engineering and technical staff for 60 places and workers for 140 places) - supporting infrastructure for the mining and processing plant under construction.
Scope of design work
AYU-Project specialists prepared sections of the design documentation “Power supply system” and “Communication networks” for the listed buildings, providing power reserves for the growing energy consumption of rotational camps and ensuring stable communication between the remote facility and the central control center of the plant.