AYU-Project has developed design documentation for engineering and technical security equipment for five 220 kV substations of PJSC Rosseti, using a single standard technical solution adapted to the conditions of each specific site.
Client
The project was carried out by order of PJSC Rosseti, the largest Russian electric grid company operating high-voltage infrastructure facilities throughout the country.
Facility
The design objects were five substations 220 kV, related to the critical infrastructure of the fuel and energy complex.
Scope of design work
AYU-Project engineers have developed design documentation for the organization of engineering and technical security equipment (ITSO), including security alarms, video surveillance and access control to protect substations from unauthorized entry. For all five facilities, a single standard technical solution was used for the composition of security equipment, which complies with the requirements of legislation on the safety of fuel and energy complex facilities.