AYU-Project prepared working documentation for a structured cabling system and external fiber-optic communication line networks for the Abakan Thermal Power Plant, covering the installation of communication networks up to 23 facilities on the territory of the station.
Client
The project was carried out for Abakan CHP plant, located on the territory of the Tashebinsky industrial hub in Abakan.
Facility
The design object was the territory of an existing thermal power plant, which included 23 objects, between which it was necessary to organize a unified communication network.
Scope of design work
AYU-Project specialists have developed working documentation for the organization of a structured cabling system (SCS) and external fiber-optic communication line networks (FOCL) to 23 facilities on the station territory. The use of optical fiber instead of copper cable is due to the insensitivity of optics to electromagnetic interference of generating equipment, which ensures reliable transmission of data from plant process automation systems to control centers.