“AYU-Project” developed design and estimate documentation for an internal and external fire-fighting water supply system for eight buildings of the production, technical service and equipment base in Novy Urengoy with a total route length of up to 500 meters.
Client
The project was carried out by order of IC GazInformPlast LLC for the production, technical maintenance and supply base (BPTOiK), located in Novy Urengoy.
Facility
The design object was eight buildings of the base at the address: st. Taiga, 163, in Novy Urengoy, Yamalo-Nenets Autonomous Okrug - a region with a long period of negative temperatures.
Scope of design work
AYU-Project specialists have developed design and estimate documentation for a fire-fighting water supply system, including internal and external circuits (IFWS) with a total route length of up to 500 m for eight base buildings. During the design, the conditions of the Far North were taken into account: the pipelines are protected from freezing, and the calculation of water pressure and flow was carried out based on the fire hazard category of the materials and equipment stored on site.