"AYU-Project" prepared documentation for the reconstruction of seven transformer substations 6-10/0.4 kV in Omsk by order of JSC "Omskelektro" - a group project that made it possible to unify technical solutions for all facilities at once and coordinate the substations’ phased removal from service for refurbishment.
Client
The project was carried out by order of Omskelectro JSC, a territorial network organization that provides power supply to consumers in the city of Omsk.
Facility
The design objects were seven transformer substations 6-10/0.4 kV located in Omsk, including the site at the address: st. Lisa Chaikina, 8.
Scope of design work
AYU-Project engineers completed design documentation for the reconstruction of substation buildings and the replacement of outdated transformer and switching equipment with more powerful and energy-efficient analogues. A group approach to the reconstruction of seven facilities made it possible to apply uniform architectural and technical solutions, reducing the client’s costs for designing each substation separately and ensuring the phased removal of equipment for repairs without interruptions in the city’s power supply.